Costs for New Nuclear Reactors

A week or two ago, FuturePundit sparked a long string of comments regarding the cost of new nuclear reactors in the United States. The blogger found it difficult to find good information on the projected costs of new nuclear units in this country, and as a result had difficulty accurately comparing future nuclear electric power costs to fossil fuel electric power costs.

To ensure a common basis for comparison, the capital costs of electric generating technologies are expressed in dollars per kilowatt of capacity. The capital costs used in such comparisons are so-called “overnight” capital costs—i.e., they assume the plant is built “overnight” and thus do not include interest charges and financing costs.

In order to provide competitive electricity, the nuclear industry has determined that the next generation of nuclear reactors must have overnight capital costs in the range of $1,000 – $1,200 per kilowatt of generating capacity for the so called “Nth-of-a-kind” nuclear plant. Nth-of-a-kind capital costs are achieved after first-time design and engineering costs have been recovered and as industry incorporates improvements in construction techniques and construction management gained during construction of the first few units.

The industry’s capital cost targets have a sound basis in rigorous estimates performed by reactor vendors. Westinghouse has invested millions of dollars evaluating its estimates for the AP1000 Advanced Light Water Reactor (ALWR), and their estimates have been verified and endorsed by the Electric Power Research Institute (EPRI), multiple utilities, and several international architect-engineers, including The Lungmen (Dragon Gate) nuclear projectin Taiwan.

Areva’s European Pressurized Water Reactor, which is currently under construction in Olkiluoto, Finland, is anticipated to be completed within 48 months; similar schedules are believed possible in the United States. The US nuclear industry is currently in the process of solidifying and streamlining the process through which new plants will be built, via early site-permitting and a combined operating and licensing procedure that will avoid delays such as those experienced by the first generation of US plants.

Technorati tags: , , , , ,

Comments

Popular posts from this blog

An Ohio School Board Is Working to Save Nuclear Plants

Ohio faces a decision soon about its two nuclear reactors, Davis-Besse and Perry, and on Wednesday, neighbors of one of those plants issued a cry for help. The reactors’ problem is that the price of electricity they sell on the high-voltage grid is depressed, mostly because of a surplus of natural gas. And the reactors do not get any revenue for the other benefits they provide. Some of those benefits are regional – emissions-free electricity, reliability with months of fuel on-site, and diversity in case of problems or price spikes with gas or coal, state and federal payroll taxes, and national economic stimulus as the plants buy fuel, supplies and services. Some of the benefits are highly localized, including employment and property taxes. One locality is already feeling the pinch: Oak Harbor on Lake Erie, home to Davis-Besse. The town has a middle school in a building that is 106 years old, and an elementary school from the 1950s, and on May 2 was scheduled to have a referendu

Why Ex-Im Bank Board Nominations Will Turn the Page on a Dysfunctional Chapter in Washington

In our present era of political discord, could Washington agree to support an agency that creates thousands of American jobs by enabling U.S. companies of all sizes to compete in foreign markets? What if that agency generated nearly billions of dollars more in revenue than the cost of its operations and returned that money – $7 billion over the past two decades – to U.S. taxpayers? In fact, that agency, the Export-Import Bank of the United States (Ex-Im Bank), was reauthorized by a large majority of Congress in 2015. To be sure, the matter was not without controversy. A bipartisan House coalition resorted to a rarely-used parliamentary maneuver in order to force a vote. But when Congress voted, Ex-Im Bank won a supermajority in the House and a large majority in the Senate. For almost two years, however, Ex-Im Bank has been unable to function fully because a single Senate committee chairman prevented the confirmation of nominees to its Board of Directors. Without a quorum

NEI Praises Connecticut Action in Support of Nuclear Energy

Earlier this week, Connecticut Gov. Dannel P. Malloy signed SB-1501 into law, legislation that puts nuclear energy on an equal footing with other non-emitting sources of energy in the state’s electricity marketplace. “Gov. Malloy and the state legislature deserve praise for their decision to support Dominion’s Millstone Power Station and the 1,500 Connecticut residents who work there," said NEI President and CEO Maria Korsnick. "By opening the door to Millstone having equal access to auctions open to other non-emitting sources of electricity, the state will help preserve $1.5 billion in economic activity, grid resiliency and reliability, and clean air that all residents of the state can enjoy," Korsnick said. Millstone Power Station Korsnick continued, "Connecticut is the third state to re-balance its electricity marketplace, joining New York and Illinois, which took their own legislative paths to preserving nuclear power plants in 2016. Now attention should